What to read next

9 Comments

  1. 1

    Pritam

    Thank you Arror sir.

    Can you tell us something about the four sided large phased array radars above the dock (model)???? Is it a version of MF-STAR or a version of Indian LRTR????

    Reply
  2. 2

    Anonymous

    Thanks Shiv

    I have a question regarding the supporting blocks for the Ship. I have seen on Discovery that all US ships made by US , used wood as the supporting blocks, as they are easier to work with and are more flexible in terms of moving, cutting, weight handling etc.

    Is there advantage of using concrete blocks to support the ship, as shown in some of the pics.

    Sorry, if it is a silly question.

    Thanks
    Ankur

    Reply
  3. 3

    Anonymous

    Don’t know what you are smoking Shiv Aroor, but at least get your facts right. Cochin Shipyard can build ships upto 90,000 dwt/ maybe 100,000 dwt or so. They have built oil tankers of approx that size. The IAC is around 60% that size.

    Reply
  4. 4

    fighterclass

    not 60% but 40 %.
    yep shiv, that’s a goof up.

    pritam, it would be MF-STAR for the barak-8.

    Reply
  5. 5

    Anonymous

    fighterclass and anon at 9.43 am, absolutely correct.

    Reply
  6. 6

    Anonymous

    Please correct Admiral initials i.e MK and not HK. Be careful while collecting facts. Cross check the blog before uploading for correctness. Indeed a nice and commendable attempt.
    Best Regards
    Rakesh

    Reply
  7. 7

    Anonymous

    daydreaming by prasun sengupta this what he said——->

    Consequently, the cost of procuring the gorshkov aircraft carrier comes to about US$2.1 billion, which is what any other foreign shipyard like Fincantieri or Navantia would charge,non-Russian shipyards would have delivered such an aircraft carrier within four years of contract signature
    ———————————-bullshit,

    my response

    c how long itatilan cavor took 7 years to build and that was 27000 tons and building 37500 tons of carrier would take upto 9 years

    and italian cavor still in trials and being fitted out and will only be operational by end of 2009

    and i have already said that rebuiding old cruiser to aircraft carrier is much harder than building new one

    intial cost of building in cochin shipyard is set $ 3 billion and it will definitelly will increase and u must know that cost of labour and other systems r much cheaper in india than italy

    if a carrier of 37500tons in india cost intially minimum of $ 3 billion then building same in italy will be no less than $ 5 billion and that also takes upto 9 years

    Reply
  8. 8

    Anonymous

    regarding the confusion on size and capacity 60% or 40%
    dear friened 90000dwt is the dead weight or carrying capacity of the ship..its actual light ship weight will be the order of 15000 to 20000t. for a naval ship of 37000t light ship would be be an order of 20000t to 25000t since it carries only fuel,weapon and crew .

    Reply
  9. 9

    Anonymous

    regarding the advantages of concrete blocks vs wood blocks.. dear friend wood portion is always placed on top of concrete of steel blocks ..wood will give a cushion effect and will not damage the steel plate..

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright © . All rights reserved.