What to read next

9 Comments

  1. 1

    anand k singh

    Will we ever be able to get things right ?

    Reply
  2. 3

    mahuja

    Seems like a misleading headline. Sure there were issues that IAF pointed out after the design was frozen in 2009. They seem fixed, but the lesson here is that IAF needs to feel like its their project since they came up with the silly specs of wanting a small light fighter that is loaded with the stuff found on f-15s and MKI's.

    Reply
  3. 4

    Anonymous

    Shiv, where is the MOD flaging anything, they are responding to a query and all three noted there are hardly anything, considering, IAF did not want to wake up on time and first one, I have to ask this, how many aircraft's in the Indian Air Force have this POD or had these when the requirement was put across.
    My concern is the heading is misleading, the statement itself is just an update not denouncing anything. Nor should it be seen as accepting anything.

    Reply
  4. 5

    Anonymous

    The biggest shortcoming is that it is not imported and does not come with bribes.

    Reply
  5. 6

    Anonymous

    It seems that Tejas is doomed as a fronline fighter for the IAF. This is the right time to bring in a few squardrons of Mig 29M/SMT for a one to one replacement of the Mig 21 without any tamasha A better choice would be the Gripens in an air defense role but the media and the opposition will have a field day screaming scam from rooftops.

    The Tejas can continue as a Naval fighter since the requirements are few and can be met by the HAL PSU.

    Reply
  6. 7

    Anonymous

    Quite trivial issues which can certainly addressed by suitable mods during the service life of the aircraft. Certainly does not merit the hype generated in the headline!! There seems to be some serious lobby trying to scuttle the effort.

    Reply
  7. 8

    Dalip Bhati

    Kuch bhi ho Apna hai — all will get well in due course of time — Rome was not made in a day

    Reply
  8. 9

    Anonymous

    Much smaller electronic jammers are now available as well as new high end technology is available like giving wrong information of the position to the adversary. There are technologies that can copy the friend information and relay to the opponent confusing it as a friend. The advantage of LCA is it is small , made mostly of composites and should have smallest radar cross section and with GE 414 ÉPÉ engines it can deliver unparalleled performance. With that high T/W ratio the internal fuel can be increased to 6 K liters and conformal fuel tanks be added. The front section has to increase in length to have electronic warfare suite. The maintanence must be user friendly so that in 30 minutes it can be refueled and rearmed and ready for next sortie so that with high sortie rate you have effective force expansion.The air intakes have to be redesigned. The naval version should have thinner wings in cranked delta shape with 20 percent increase in surface area with spoilers on the sides. Moulded wing desiegn would help in thinning the wings and reducing the weight. I feel this is most crucial and most difficult phase of the plane desiegn and I remember the. Good old days when NG was spending a million dollar a day and placed every possible resource to work.Quickly built a prototype and start. Testing the prototypes with GE 414 engines.success is waiting for you.

    TIMBAKTOO

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright © . All rights reserved.